Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2020-12-18 05:00
392
Company Profile
Huangyan Jinzhuo Plastic and Mould FactoryBy certification [File Integrity]
Contact:jinzhuo(Mr.)
Email:
Telephone:
Phone:
Area:Zhejiang
Address:Zhejiang
Website:http://www.thinwallmoldiml.com/ http://jinzhuo.zu-liao.com/
Mould Name | disposable microwave plastic food bowl mould |
Cavity/Core |
Customers’ needs( single, multi) |
Mould steel material |
1.2344 , 718 , P20 or as requirement |
Mould running |
Fully automatic |
Mould runner system |
Hot runner |
Mould features |
Excellent precision control for dimension tolerance |
RFQ
Q1: What kind of molds do you make? Plastic injection mold, Compression mold or something else?
A1: We are mainly making plastic mold injection and rubber compression mold.
Sometimes we also make die casting molds according to our customer’s requirements.
Q2: Do you build hot runner plastic moulds?
A2: Yes. We build hot runner Plastic Moulds and specialized in many different systems, such as DME,Master,Mastip,Hasco,Yudo,Incoe,Husky,etc.
The manifold recommended for your tool is selected to meet your individual needs.
Q3: What types of files do you accept (drawings)?
A3: With our CAD systems we can accept following files:
STP, IGS, DXF, DWG, Cad Key PPT, STL, X_T, CATIA, UG files, etc.
Q4: What kind of steel do you use for plastic mouldings?
A4: We can use any type of steel appointed by customer or popular in the market.
Such as P20, 718, S136, 1.2344, etc.
Q5: Can you provide the steel certificate and heat-treatment certificate?
A5: Yes, We can provide steel certificate or hardness certificate to prove.
Q6: Can you make the texture / text / heat-treatment /nitriding for the inejction mold plastic?
A6: Yes, As plastic mold factory, we have long-term cooperated subsidiary factories that do those processes.
They are professional and well reputed in our local market.
Q7: How long is the lead-time for a plastic injection mold?
A7: It all depends on the mold’s size and complexity.Normally, the lead time is 45days.
Q8: Do you make spare parts for your customer?
A8: Yes, we will provide spare parts for the mold if needed or required by client.
Q9: How do you pack the china plastic moulds?plastic injection mold packaging
A9: We pack the plastic moulds with wooden box.
There are the main 3 operation steps.
First Step: We daub some rust preventive oil on the mold.
Second step: We pack the mold with thin plastic film to avoid moisture.
Third step: We put this plastic film packed mold in a wooden box, and fix it avoid any movement.
http://www.thinwallmoldiml.com/